Agentic AI Capability

Juno checks what happened against what the agent was asked to achieve.

Each agent carries an objective in one sentence, a measure, a check window and a guard measure.

WHAT THE AGENT WAS ASKED TO ACHIEVEwritten once, versioned with the ruleThe objectiveone sentence, written with the agentThe measurethe figure that shows whether it was metThe check windowwhen the measure is read: day 14, day 30The guard measurewhat may go wrong, watched alongsideWHAT HAPPENED BY THE CHECK DATEmeasured on your own dataThe measured resultread from your systems, in placeThe verdictmet, missed or still openThe recordverdict stored with the decisionWhat followsa finding, a rule proposal or a level changethe check runson the date youset
The objective is written once and travels with the rule version. The reading happens on the date you set, on your own data. Showcase estate.
29
cancellations checked at day 14 in the showcase estate
showcase estate
11.4 to 6.2
weeks of projected cover on the lines acted on
showcase estate
1
material that raised a shortage message and was re-ordered
showcase estate
3
roles shown with an objective, a measure and a window: one in production, two designed
showcase estate
Where this sits

Stage 6 of six: learn

Step by step

How an objective becomes a verdict you can read

Three choices set an outcome check up: the objective, the measure and the window.

HOW AN OUTCOME CHECK IS SET UP AND RUN01Write theobjectiveone sentence agreed withthe agent’s owner02Name the measurethe figure to read, andthe guard measure besideit03Set the windowthe days between theaction and the reading04Read the resultfrom the same sources,with the same definitions05Record the verdictmet, missed or still open,per decision and per agenta missed verdict opens a review of the rule or the level
Steps one to three happen once, when the agent is set up. Steps four and five run for every decision the agent makes.

An objective states the result the agent is there to produce, in one sentence a planner and a manager both recognise. The PO cancellation agent in the showcase estate carries this one: cancel purchase order lines that stand above the need, inside their cancellation window. The need is eight weeks of demand, so the measure behind the sentence is the projected cover on the lines it acts on.

A measure turns that sentence into a figure. For this agent the measure is the projected weeks of cover on the lines acted on, read 14 days after the write-back. The measure uses the same ontology definitions as ChatLima, so the number on the check matches the number a planner sees when asking.

A guard measure watches the other side of the objective. Cancelling too much would show up as shortage messages, so the guard measure counts shortage messages raised for those materials within 28 days. A target with a guard beside it keeps a single figure from telling half the story.

The check window is the gap between the action and the reading. Short windows give fast feedback; long windows measure what a manager cares about. Juno holds the verdict as still open until the window closes, so a page of verdicts always says which readings are complete.

The check in practice

Three roles, their objectives and what the checks would find

The same three columns would describe every role built from the blueprint, from one plant to a whole chain.

Agent and levelWhat it was asked to achieveMeasure and windowWhat the check found
A2 PO cancellationBring projected cover on the lines it acts on to eight weeks or below, and keep supply inside the lead-time fence.Weeks of cover at day 14 · shortage messages at day 2829 actions: cover 11.4 to 6.2 weeks; 1 material raised a shortage message and the line was re-ordered.
A2 Safety stockHold the service level for A-class materials at plant 1210 at 98% and release held stock where cover allows.Service level and stock value at day 3064 changes: service level 98.3%; stock value down $310,000 at the plant.
A1 Lead time driftFlag suppliers whose measured lead time moves more than three days from the planning value.Agreement with the buyer’s judgement at day 2118 flags: 15 confirmed by buyers, 3 returned as seasonal and used to raise the threshold.

Showcase estate. The PO cancellation row is the agent in production; the safety stock and lead time drift rows are designed roles from the agent blueprint, shown as they would report. The observability page shows the decisions behind each row. blueprint

Juno reports verdicts per agent and per 1,000 decisions: met, missed and still open. Managers read the same three figures for every agent, whichever chain it belongs to and whichever level it runs at.

Drift

When live data moves away from what a rule assumed

Rules rest on assumptions, and Juno watches the assumptions as closely as the results.

MEASURED LEAD TIME AGAINST THE RANGE THE RULE ASSUMED14d18d22d26d30drange the rule assumedWeek 1Week 2Week 3Week 4Week 5Week 6Actual lead time · Delta Fasteners Ltddrift raisedshowcase estate · planning lead time 21 days · drift threshold 3 days
A rule written for a 21-day lead time keeps working while the readings stay inside the range. In week four the readings leave it, drift is raised and the rule’s owner decides. Showcase estate.

Every published rule carries the assumptions it was written on: a lead time, a price band, a demand pattern, a supplier class. Juno reads those values from live data on a schedule and compares them with the assumption held in the rule version.

A reading outside the agreed range raises drift. The drift finding names the rule, the version, the assumption, the measured value and the decisions made since the readings started to move. The owner of the rule receives it the same day.

Drift is a signal about the rule, so the answer is a rule decision. Your team widens the range, changes the condition or lowers the agent a level while the case is open. Each answer arrives as a new version, and the audit trail records which decisions were made under which assumption.

Gartner, 11 March 2026, predicts that by 2030 half of agent deployment failures will come from weak enforcement of governance at run time. Outcome checks and drift readings are that enforcement, running on the same data the agents act on.

A missed verdict

What follows when the result misses the objective

A missed verdict is a route into the rules, and every step of that route is recorded.

1
Record the missthe verdict is written beside the decision that caused it
recorded
2
Tell the ownerthe named owner of the agent sees it the same day in the manager report
owner told
3
Hold the same kind of actionfurther actions of that kind wait for a person while the case is open
waiting
4
Read the case togetherfacts, rule version, limits, the person’s decision and the outcome
review
5
Change the rule or the levela new rule version, or one step down the ladder, recorded either way
version or level

Holding actions of the same kind is a choice your team makes per agent: everything above a value, or only the material family in question. The setting sits with the limits, and the audit trail records when it was applied.

Lowering a level takes one step and is immediate. Raising it again takes a passing test on recorded cases, a named owner’s approval and a live escalation route, so a verdict that missed stays visible in the evidence for the next move.

The running example

Day 14: what the 29 cancellations actually did

Showcase estate.

The running example

On Monday 5 October, 14 days after the write-back, Juno read the projected cover on the 29 lines D. Okafor approved. Cover on those lines fell from 11.4 weeks to 6.2 weeks, inside the objective. The check recorded a met verdict against each of the 29 decisions and against the agent for that week.

The guard measure told the rest of the story. One material, 7741-X at plant 1210, raised a shortage message on day 19. The line had been cancelled inside its window, and demand moved forward the following week. The buyer re-ordered it, and the case became the first candidate for a lead-time fence condition in a later version.

Next capability

The audit trail

One record per action: signal, rule version, facts, limits checked, approver, write-back, acknowledgement and outcome, replayable at any date.

How this is usually done

Reports that count actions

The difference is between counting actions and measuring results.

Most automation reports count what the machine did: rules fired, messages sent, orders changed. Activity counts answer whether the thing ran. They leave open the question a finance lead asks, which is whether the result improved.

Gartner, 5 August 2026, found that 55% of chief supply chain officers are unclear on the returns from AI, while 67% of their digital investment goes to it. An objective, a measure and a window per agent turn that question into a figure your own team reads each month.

Terms on this page
ObjectiveOne sentence stating the result an agent is there to produce, agreed with its owner.
MeasureThe figure read at the check window to decide whether the objective was met.
Guard measureA second figure that watches the risk on the other side of the objective.
Check windowThe days between an action and the reading of its result.
VerdictThe recorded result of one check: met, missed or still open.
DriftA live reading that leaves the range a published rule assumed when it was written.
Questions
Who writes the objective?

The owner of the agent writes it with the planner or buyer who does the work today. It is reviewed when the agent moves a level, and it is stored with the rule version it belongs to.

What happens when the outcome depends on other things too?

The measure states what the agent is accountable for, and the guard measure states what it may harm. Where an outside event explains the reading, the reviewer records the reason, and the verdict keeps that note.

Can a check run on past decisions?

Yes. A new objective can be read against decisions already made, because the facts, the rule version and the outcome are all held in the record. Teams use this to set a fair target before an agent moves up a level.

Where does this sit in an analyst’s categories?

Gartner’s decision intelligence platform market, published on 26 January 2026, names outcome assessment and decision governance among its mandatory features. This page and the audit trail page cover both.

In the platform

Where Juno sits among the four capabilities

Each one builds on the one before it.

One shared foundationCatalogLineageAccess policyWrite path

See Juno answer and act on your own data

Bring two systems and one decision your planners make every week. In the first week we register the data, confirm the mapping with your team, answer your questions in ChatLima and run the first agent at the level you choose.