Five demonstrations, each showing one thing from start to finish. They are ungated; the interactive demo runs in the browser. Recordings are labelled by status until they are published, so nothing here promises a video that does not exist yet.
From connecting SAP to a plan returned and confirmed: what Lima does, in two minutes, with the screens.
Five steps in the browser: connect SAP, first load to Kinaxis, the reconciliation report, a write-back confirmed, the run dashboard.
02:14 an anomaly fires; three pipelines are held; 02:51 root cause; 02:58 resumed from checkpoint; 841K events replayed; the 06:30 deadline met with 3h 32m to spare.
A planned order created in Kinaxis becomes BAPI_PLANNEDORDER_CREATE in S/4HANA; the confirmation appears in the planner's screen; the ledger records it.
Week by week from contract to production on the showcase estate: connect, rules and baselines, two agents, day 22.
| Demonstration | What you see | Belongs to |
|---|---|---|
| 2-minute tour | Connect · extract · check · load · return, on the screens | Backbone hub |
| Interactive demo | Click through a first load and a confirmed write-back | Planning integration |
| Incident replay | Pause on a failed check, deadline clock paused, resume and replay | Orchestration |
| Closed loop | Kinaxis planned order to S/4HANA, confirmed and in the ledger | Write-back |
| The 22 days | Contract to production, week by week | Control tower |
A live demonstration on your estate, scoped in one call.