Outcomes Customer outcomes

The result, measured from the first day.

Every Lima engagement starts by measuring where you are, so the change can be shown afterwards. This page collects the results so far: case tiles from customer engagements, anonymised until each customer agrees to be named; figures from the showcase estate; the method used to measure; and samples of the two reports every engagement produces, the quarterly delta report and the reconciliation report.

1BaselineFour weeks before go-live: theKPIs read from your systems, withthe definitions agreed andwritten down.2Go-liveDay 22 for a control tower; week4 for a first load. The samedefinitions keep running.3Delta reportEach quarter: baseline againstnow, per KPI, with the engagementthat moved it.4Reconciliation reportAfter every run: rows in, rowsout, control totals and varianceper table.
How a result is measured: a baseline before go-live, the same definitions afterwards, a delta report each quarter, and a reconciliation report after every run.
70% lower
integration cost against a custom build on the same planning program
customer engagement · anonymised
8–10 wks
to a first full planning load on recent programs
customer engagements · anonymised
$3M
of lost sales avoided by dynamic network routing
customer engagement · anonymised
22 days
from contract to production
showcase estate
44 min
from anomaly to resolution, deadline kept
showcase estate
99.9%
uptime since June 2025
showcase estate
Case tiles

Context, what ran, what was measured.

Anonymised until a customer agrees to be named; specific enough to be checked with the account owner. Adding a name is a content edit.

$75B semiconductor manufacturer · planning bridge
1,000+ tables

ERP to planning, as one bridge

The bridge from the ERP into the planning application carries more than a thousand tables. Integration cost came out about 70% lower than a custom build on the same program.

customer engagement · anonymised · Backbone
$25B manufacturer · planning bridge
800+ tables

A second planning bridge at scale

Eight hundred tables from SAP into the planning application, kept current on the planning calendar.

customer engagement · anonymised · Backbone
$6B industrial · since 2022
4 years

In production since 2022

Planning data delivered on the calendar since 2022; the loop returns approved plans to the ERP.

customer engagement · anonymised · Backbone
$5B consumer goods · since 2020
6 years

In production since 2020

The longest-running planning integration on the platform.

customer engagement · anonymised · Backbone
Logistics · dynamic network routing
$3M avoided

Lost sales avoided

Re-routing decisions made on live order, stock and carrier data: 23% higher container utilisation and 11% shorter lead times on the routes in scope.

customer engagement · anonymised · agents
Warehousing · capacity agent
€300K a year

Warehouse capacity

An agent that proposes slotting and capacity moves for people to approve, saving about €300,000 a year in the warehouses in scope.

customer engagement · anonymised · agents
Inventory · excess stock agent
$500K+ released

Cash released from excess stock

Excess and slow-moving stock identified against live demand and disposed of through approved actions.

customer engagement · anonymised · agents
Allocation · supply allocation
Revenue protected

Supply allocated where it earns most

Allocation proposals written back to the ERP automatically once the rule had earned that right.

customer engagement · anonymised · agents
SAP and Oracle to Kinaxis and back
2021 since

The closed loop in production

ERP data into Kinaxis and approved plans back into the ERP, each write confirmed, in production since the fourth quarter of 2021.

production · Backbone
The method

Baseline first, then the difference, with the same definitions.

A result is only worth showing if the number before it is written down. This is how every engagement does that.

Agree the KPI definitionsOTIF, days of inventory, inventory turns, forecast accuracy (MAPE), perfect order rate, time to resolve an incident, run-window adherence, reconciliation variance, hours to a first load, cost to serve. Each definition names the tables and the rule.
Read the baseline from your systemsFour weeks before go-live, from the same systems Lima connects to. No survey, no estimate.
Keep the definitions runningThe same definitions run after go-live, on the same systems, so the comparison is like with like.
Report each quarterBaseline against now, per KPI, with the engagement that moved it and the confidence in the attribution. A redacted sample is below.
KPIPlain meaningRead from
OTIFOrder lines delivered on the promised date, in fullsales orders, deliveries
Days of inventoryHow many days the stock on hand would laststock, consumption
MAPEHow far the forecast was from what happened, as a percentageforecast, actuals
Perfect orderOrders with no error in date, quantity, damage or paperworkorders, deliveries, claims
Time to resolveFrom an anomaly firing to the fix in placeincident record
Run-window adherenceLoads that met their deadlinerun reports
Reconciliation varianceRows and totals that differed between source and targetreconciliation reports
Hours to first loadFrom kick-off to the first full planning datasetengagement record
The quarterly delta report

One page, per KPI, with the attribution stated.

The sample below is redacted and uses the showcase estate's figures. The structure is the one every customer receives.

quarterly delta report · redacted sample · structure real, values from the showcase estate
KPIBaseline (4 wks pre go-live)Latest quarterChangeEngagementAttribution
OTIF, key accounts87.2%89.6%+2.4 ptscontrol tower · carrier exceptionshigh
Time to resolve a data incident~15 h44 min−14 horchestration · auto-hold and replayhigh
Run-window adherence, planning loads91%100%+9 ptsBackbone · run windowshigh
Reconciliation variance, planning loadsn/a0 rows · 3 heldreportedBackbone · checksn/a
Compute cost, cache savings£0£1,840 / monthsavedData Fabric · cachehigh
Forecast accuracy (MAPE), 7-dayn/a88% accuracytrackedChatLima forecastsmedium

Attribution says how confident the team is that the engagement caused the change: high when the KPI is read from the pipeline itself, medium when other changes were in flight. The baseline 'about 15 hours' for incident resolution is the industry figure used where no internal baseline existed.

The reconciliation report

After every run, per table.

The report a planner, an auditor or a migration lead uses to accept a load. Rows in, rows out, control totals and variance per table, and the exceptions with their owners.

DatasetSource rowsLoadedVarianceControl totalStatus
Item masterMARA · MARC2,914,2202,914,2200—Reconciled
BOM componentsSTPO · STKO18,406,11318,406,1130qty 1.20 × 10&sup9;Reconciled
Open purchase ordersEKKO · EKPO1,204,8811,204,8783 → ownersvalue matched3 exceptions
Sales ordersVBAK · VBAP6,102,4476,102,4470qty matchedReconciled
Forecastexternal file412,006412,0060—Reconciled
Planned orders returnedBAPI_PLANNEDORDER_CREATE41,20741,207 confirmed0—Confirmed
Illustrative sample. Record counts and control totals are compared per dataset on every run; the three held-back purchase-order lines were routed to their buyers and replayed on the next run.
Across engagements

Three aggregate figures, each footnoted.

2,000+
autonomous recommendations per planning cycle, proposed for approval
agent deployments · engagement reports
12%
operating profit impact on the programs measured
engagement reports · to be confirmed per program
15%
inventory reduction on the programs measured
engagement reports · to be confirmed per program

Each aggregate is traceable to the engagement reports behind it; the account owners confirm each program before a figure is quoted outside this page.

Named customers

As references are agreed.

Named stories are added here as customers agree to be quoted. The section is designed so that adding one is a content edit.

Reference in review · semiconductor equipment

Planning bridge and control tower. Name and quote pending the customer's approval.

Reference in review · consumer goods

Planning integration since 2020. Name and quote pending approval.

Reference in review · logistics

Dynamic network routing agents. Name and quote pending approval.

On reviews

Review badges appear on this page when ten or more verified reviews exist on the public review sites. Every first-load and pilot customer is asked for one at go-live.

Terms on this page

Plain meanings.

BaselineThe value of a KPI before go-live, read from your systems with the agreed definition.
Delta reportThe quarterly comparison of baseline and current values per KPI, with the engagement that moved each.
AttributionHow confident the team is that the engagement caused the change: high, medium or low, with the reason.
Reconciliation reportThe report after every run: rows in, rows out, control totals and variance per table.
AnonymisedA real engagement described without the customer's name, pending their approval to be named.
Showcase estateThe worked example used in demonstrations; its figures are labelled so they are never mistaken for a customer's.
Questions

Asked about results.

Why are the customers anonymised?

Because their approval to be named is pending. Each tile is specific enough to be checked with the account owner, and a name is added as a content edit when agreed.

Who reads the baseline?

Lima does, from your own systems, with definitions your team agreed. No survey and no estimate.

Can we get the reports in our own tools?

Yes. Both reports are data products in Lima; they can be read through the API or landed in your warehouse.

See the method on your own numbers.

A demo that starts with your KPIs and shows where the baseline would come from.