Connectors OMP

OMP, loaded from your ERP on your planning calendar.

OMP plans process industries. Its model needs recipes with co-products and by-products, density and unit conversions, batch characteristics flattened from the ERP's classification tables, changeover matrices, rates and tank capacities. Lima builds these from SAP or Oracle, keeps the changeover matrices as governed master data, loads through OMP's staging interfaces and returns the plan to the ERP.

ERPS AND EXECUTION SYSTEMSSAP ECC · S/4HANAreleased interfacesOracle EBS · Fusion · JDEdatabase reads · APIsOther ERPs and WMSAPIs · database readsLIMA BACKBONEExtractfull, then changes onlyCheckcompleteness · consistency · orderShape and loadinto OMP's model, on the calendarPLANNING APPLICATIONOMPRecipes with co- and by-products, unit…THE APPROVED PLAN RETURNS TO THE ERP · EACH WRITE CONFIRMED
How OMP fits the six Backbone steps. It is a planning target: the ERP's data is shaped into its model and loaded on the calendar; the plan is read back for the ERP.
2
ways to load it
this connector
2
patterns supported
this connector
3
ways to run: SaaS, private cloud, on-premise
product
22 days
from contract to production
showcase estate
How Lima loads and reads back OMP

Method by method.

Each method has a job. The first load uses the bulk method; the daily run uses the incremental or change-capture method; write-back uses the interface the system itself uses.

MethodWhat it doesWhen it is used
Staging interfacesLoads OMP's staging tables and triggers the import.First and net-change loads.
Plan readsReads the production and distribution plan.Write-back to the ERP.
What it covers

Objects and patterns.

The objects are the tables, views or records Lima reaches through the methods above. The patterns say how a copy is made and kept current.

ObjectPlain meaning
Recipeswith co-products and by-products
Unit and density conversionsthe arithmetic of process quantities
Batch characteristicsflattened from classification
Changeover matricesgoverned master data kept in Lima
Rates and tankscapacity
PatternSupported
Full loadfirst load
Incrementalnet change
Change capture—
Streaming—
Write-back—
What OMP expects

The landing model, and the hardest part.

ModelRecipes with co- and by-products, unit and density conversions, batch characteristics, changeover matrices, rates and tanks.LoadConversions checked for consistency, characteristics flattened and validated, matrices versioned in Lima, then loaded through the staging interfaces.BackThe plan returns to the ERP as process orders and transfers, each write confirmed.
The hardest part, in one sentence

Getting yields and conversions right so planned quantities in OMP match what the plant can actually make.

Before you start

Prerequisites, then four steps.

The prerequisites are what the team that runs OMP grants. The four steps are the same for every connector.

  • OMP integration user and staging access
  • Classification characteristics agreed with the planning COE
  • Run window per cycle
Register the connectionEndpoint, credentials from the vault, and the method. The connection is tested and a failed test names the cause.
Choose the objects and the patternPick tables or objects from the discovered schema, and the pattern: full, incremental, change capture or streaming.
Run the first load with checks onEvery row is valid or becomes an exception with an owner. The run ends with a count and a control total per table.
Schedule it on the business calendarA run window with a deadline; pause, resume and replay if a check trips; the report after every run.
What happens to a bad record

Incoming data = valid records + exception records. A row that fails a check is kept, routed to the person who owns it with a deadline, and replayed once fixed. The load carries on with the valid rows and the report says exactly what was held back. How exceptions work →

Pair pages

OMP in a source-to-target path.

Each pair page covers one path end to end: objects out, model in, checks, cadence and the offer.

/connectors/sap-ecc-to-omp

SAP ECC to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/sap-s4hana-to-omp

SAP S/4HANA to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/oracle-ebs-to-omp

Oracle E-Business Suite to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/oracle-fusion-cloud-erp-to-omp

Oracle Fusion Cloud ERP to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/oracle-jd-edwards-to-omp

Oracle JD Edwards EnterpriseOne to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/peoplesoft-to-omp

Oracle PeopleSoft to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/microsoft-dynamics-365-to-omp

Microsoft Dynamics 365 Finance and Supply Chain to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/infor-ln-m3-to-omp

Infor LN and M3 to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
/connectors/netsuite-to-omp

Oracle NetSuite to OMP

Planning integration: first load, then net change on the planning calendar; the plan returns to the ERP.

Open the pair page →
Status and evidence

Stated plainly, with dates.

OMP technology alliance: planned Q1 2027
Terms on this page

Plain meanings.

ConnectorA packaged way to read or write one kind of system, with its authentication, methods and prerequisites described.
Full, incremental, change capture, streamingFour ways to make and keep a copy: read everything; read what changed since last time; read changes from a log as they happen; consume events in small batches.
Write-backWriting a result into the system that owns it through its released interface; the system's response is the confirmation.
Control totalThe sum of a key amount column compared between source and target, along with the row count, at the end of a run.
Exception recordA row that failed a check: kept, routed to an owner, replayed once fixed.
Net changeA load that sends only what changed since the last load, in the order the target needs.
Questions

Asked about this connector.

Does Lima install anything in OMP?

Lima connects from outside through the interfaces listed above with credentials your administrators grant. Where a vendor requires its own agent or add-on for a method, the prerequisites say so.

How is load on OMP kept in check?

Parallel reads are capped and the cap is agreed with the team that runs the system. Large reads run inside an agreed run window. Change capture keeps the daily volume small.

What do we see when a run finishes?

A report per run: rows in, rows out, control totals and variance per table, the exceptions held back and who owns them, and whether the deadline was met.

Can we start small?

Yes. Most estates start with one source, one target and one dataset, then add tables and patterns on the same connection.

Try OMP on your own estate.

A trial connects this system, runs a first load and ends with a reconciliation report. Your administrators see the prerequisites before anything is installed.