Connectors Delta Lake tables

Load Delta Lake tables from every system you run.

Delta Lake is the open table format behind Databricks and Microsoft Fabric. Lima writes Delta tables with a transaction log on S3, ADLS or GCS, applies changes with MERGE and keeps history through time travel, so the same tables serve Spark, Databricks, Fabric and Trino.

SOURCESSAP ECC · S/4HANAreleased interfacesOracle EBS · Fusion · JDEdatabase reads · APIsDatabases, files, streamsJDBC · SFTP · KafkaLIMA BACKBONEExtractfull, incremental, change captureChecktypes · keys · counts · totalsLoadAppends and MERGE per run; counts and co…TARGETDelta Lake tablesDelta tables with a transaction log; raw…
How Delta Lake tables fits the six Backbone steps. It is a target: Lima checks the rows before loading and records a count and a control total per table.
2
ways to load it
this connector
4
patterns supported
this connector
3
ways to run: SaaS, private cloud, on-premise
product
22 days
from contract to production
showcase estate
How Lima loads Delta Lake tables

Method by method.

Each method has a job. The first load uses the bulk method; the daily run uses the incremental or change-capture method; write-back uses the interface the system itself uses.

MethodWhat it doesWhen it is used
Delta writes and MERGEAppends and merges rows with a transaction log.Landing and current state.
Time travelReads earlier versions.Audits and restores.
What it covers

Objects and patterns.

The objects are the tables, views or records Lima reaches through the methods above. The patterns say how a copy is made and kept current.

ObjectPlain meaning
Delta tablescurrent state by key
Transaction logevery change recorded
PatternSupported
Full loadYes
IncrementalYes
Change captureMERGE
Streamingmicro-batch appends
Write-back—
What Delta Lake tables expects

The landing model, and the hardest part.

ModelDelta tables with a transaction log; raw, conformed and history layers.LoadAppends and MERGE per run; counts and control totals per table.BackTime travel and restore on demand.
The hardest part, in one sentence

Small files and log growth on high-frequency loads.

Before you start

Prerequisites, then four steps.

The prerequisites are what the team that runs Delta Lake tables grants. The four steps are the same for every connector.

  • Object storage credentials
  • A catalog (Unity Catalog, Hive metastore or Fabric)
  • An OPTIMIZE and VACUUM schedule
Register the connectionEndpoint, credentials from the vault, and the method. The connection is tested and a failed test names the cause.
Choose the objects and the patternPick tables or objects from the discovered schema, and the pattern: full, incremental, change capture or streaming.
Run the first load with checks onEvery row is valid or becomes an exception with an owner. The run ends with a count and a control total per table.
Schedule it on the business calendarA run window with a deadline; pause, resume and replay if a check trips; the report after every run.
What happens to a bad record

Incoming data = valid records + exception records. A row that fails a check is kept, routed to the person who owns it with a deadline, and replayed once fixed. The load carries on with the valid rows and the report says exactly what was held back. How exceptions work →

Terms on this page

Plain meanings.

ConnectorA packaged way to read or write one kind of system, with its authentication, methods and prerequisites described.
Full, incremental, change capture, streamingFour ways to make and keep a copy: read everything; read what changed since last time; read changes from a log as they happen; consume events in small batches.
Write-backWriting a result into the system that owns it through its released interface; the system's response is the confirmation.
Control totalThe sum of a key amount column compared between source and target, along with the row count, at the end of a run.
Exception recordA row that failed a check: kept, routed to an owner, replayed once fixed.
Questions

Asked about this connector.

Does Lima install anything in Delta Lake tables?

Lima connects from outside through the interfaces listed above with credentials your administrators grant. Where a vendor requires its own agent or add-on for a method, the prerequisites say so.

How is load on Delta Lake tables kept in check?

Parallel reads are capped and the cap is agreed with the team that runs the system. Large reads run inside an agreed run window. Change capture keeps the daily volume small.

What do we see when a run finishes?

A report per run: rows in, rows out, control totals and variance per table, the exceptions held back and who owns them, and whether the deadline was met.

Can we start small?

Yes. Most estates start with one source, one target and one dataset, then add tables and patterns on the same connection.

Try Delta Lake tables on your own estate.

A trial connects this system, runs a first load and ends with a reconciliation report. Your administrators see the prerequisites before anything is installed.